Close Button
Signup/Login
Back All services Close Button

World's Leading Assignment Library

Continued assistance through writing and revision till final submission by the professional and experienced writers.

  • 10 subjects

  • 2,10,1000
    solved Questions

  • 500 Solved Questions
    Added Everyday

  • Download Solution
    in Seconds

You should write a report of no more than 2000 words outlining the site investigation procedures needed to carry out a deep basement excavation project in central London. Your report should utilise ap

Question Preview:

You should write a report of no more than 2000 words outlining the site investigation procedures needed to carry out a deep basement excavation project in central London. Your report should utilise appropriate superficial and drift maps and any other relevant information. Ages and depositional environments of the strata encountered should be related to their formation environment and geographical distribution in a UK setting with an explanation of how the strata are different to other areas of the UK, this could be the Northwest of England but could be another UK location.

In addi...

View complete question »

Question Preview:

You should write a report of no more than 2000 words outlining the site investigation procedures needed to carry out a deep basement excavation project in central London. Your report should utilise appropriate superficial and drift maps and any other relevant information. Ages and depositional environments of the strata encountered should be related to their formation environment and geographical distribution in a UK setting with an explanation of how the strata are different to other areas of the UK, this could be the Northwest of England but could be another UK location.

In addition, a geotechnical failure in London should also be examined with an analysis of the failure mechanisms involved.

View less »

Solution preview

Introduction
In geo technology construction design for deep basement excavation means that loose the soil at the area where construction build and take out materials from existing soil and leave space above or below ground level. Sometimes civil engineer term use for earth work and filling soil material for require properties and advantage or strength. New material are fill, spreading and levelling over the area where construction have to make. According to British standard CP6031 which recommended about the earthwork levelling, covering, compacting, soil removing etc.

Get solution

java assignment help

© Livewebtutors. All Rights Reserved 2018

Livewebtutors
Rated 4.9/5 based on 2480 reviews
Arrow up